Consensus Of Opinion, Is This Acceptable On Here ?

Discussion in 'Builds & Projects' started by CAT3, Nov 10, 2020.

  1. Battery strap is all tacked in place now & seems to work OK, allowing the battery to be changed/removed without too much trouble !
    0809E449-2490-47B2-A4E2-5EFBAEB5E341.jpeg

    The foam strips will be stuck to the underside of the strap once it has been powder coated.
    34BEA4BB-51A3-4857-A347-9A757FA7AAB6_1_201_a.jpeg

    There's also enough clearance between the rearmost fuse holder & the underside of the cover too.
    67AAD4EE-B1F7-4BD5-99A0-D7AEF5B221E0.jpeg

    DCA73DA9-D9F4-4B45-9E56-5AEBAD559AE8.jpeg
     
    • Like Like x 5
  2. Just got back from Wells after picking up my paintwork. Couldn't wait to chuck it on, just to have a look :upyeah:
    I'll underseal the mudguard tomorrow & get that final fitted. Once that is on I can refit the rear wheel & then get the primary drive & engine tightened & then the final big job is to finish the wiring off & make all the connections.
    There's light at the end of the tunnel !!

    4549DEC1-0EDB-4A78-A100-7DCCD06A5CBE.jpeg

    CF7EC888-DE1D-4CCE-B3F5-5543563C6213.jpeg

    15678E7B-DA96-4A92-B96F-73EB93777FA1.jpeg

    3116A199-4C8F-47D0-BD67-BA2A2A55C619_1_201_a.jpeg

    977D7674-3BE0-45C7-8FD1-5016B369C8DA_1_201_a.jpeg

    C2D4FB06-8B89-465F-8C42-95B20B7086FD.jpeg

    236A7D85-DDAC-4FA6-AC10-8F24D4434CE1_1_201_a.jpeg
     
    • Like Like x 12
  3. That is a nice paint job in colour and design
     
    • Agree Agree x 2
    • Thanks Thanks x 1
  4. In fairness, I gave Joeby the colours & a basic idea of what I wanted, (he'd already done the first bike) & left him to it so all credit to him really.
    Although the design, such as it is, is only quite simple I wanted the bike to look old at a quick glance & I think he achieved that :upyeah:
     
  5. It has the look of Gulf Fords
     
    • Like Like x 1
    • Agree Agree x 1
  6. More progress made today !
    Primary drive & engine are now locked in place as is the rear wheel after checking the sprocket alignment with the gearbox.
    2A653165-3CBA-4E02-AE11-4E069A9DF7FE.jpeg
    I fitted the front cylinder exhaust too to give it a bit more of the "finished" look ! :laughing:
    C0AD0692-C6B9-41BB-A2D3-986BCC9E3EBC.jpeg

    D808471E-8863-45D0-9E56-EFDBCFE69E7B_1_201_a.jpeg

    Clutch friction plates are now draining after being soaked in AFT for a few minutes. BDL recommend leaving them to drain for 24 hours so I'll finish the clutch off tomorrow now.
    DSCN6974.JPG
     
    #186 CAT3, May 11, 2026
    Last edited: May 11, 2026
    • Like Like x 5
  7. Here I am feeling pretty pleased at getting the Akrapovic system off my bike and the original back on. Pah!

    Lovely paint job. who did it? I also love the way the paddock stands and the bike lift match.

    I’d really like to see this bike when it’s finished. I love the attention to detail.
     
  8. Me too. And the blend of modern tech and engineering solutions with vintage style. Great colour scheme.
     
  9. Steve Slight, (Jobey) of "Jobey's Airbrush Art" did the paint. He's in Wells near Glastonbury. It's a bit of a trek for me from Stockport, but he did my first bike & I liked his work so I stuck with him. I'm sure there are painters just as good closer to me, but the problem is finding them & trusting them. When I find someone who's good at their job & I'm happy with them I tend to stick with them, even if that means a bit of travelling !! ;):upyeah:

    I will post some pictures when it's finished :upyeah:
     
    • Like Like x 3
  10. Agree with sticking with someone you know and trust
     
    • Agree Agree x 2
  11. Bit more progress made yesterday. Started by securing the clutch in place, which requires locking in place while the hub nut is torqued up. The red plate locked the two parts of the clutch together & the round silver coloured gadget, (in the "5-past" position in the picture below), locks the starter ring gear. There's a good dollop of Loctite on the shaft splines & nut !!
    4075F4FD-5260-488B-8BA9-CB049A4BE332_1_201_a.jpeg

    With the clutch hub nut secure the primary belt was fitted together with the front pulley. With both locking tools still fitted the Allen screws & main nut were torqued up. again, Loctite was applied to all threads.
    75C1DA5E-AE85-4AEA-A30C-E39C147A832A.jpeg

    With that tightened the clutch plates were installed, thickest steel plate was inserted first followed by the normal friction/steel plates. Finally the spring plate locking ring was secured with the ring gear lock still in place.
    164783E2-4151-417D-9E07-1EF28C1CC9C9.jpeg

    Also, the three roll pins were driven in place in the front pulley.
    684EEC10-DB77-4CDB-9E91-C642D720328A_1_201_a.jpeg

    As a bit of extra security & my "peace of mind" I always lock-wire these fixings.
    716A7CB0-1DA0-4B01-AF84-4883BA1CF850_1_201_a.jpeg

    Next on the list was the starter motor. With the gear jack-shaft installed the motor was secured in place. The starter motor is a bit of a lump, not your usual smallish looking motorcycle starter !! It looks like it belongs on a truck or a tractor !!
    0CAE0935-FA1E-43C3-BFA7-B9C253A3B97D.jpeg

    2B97FC74-72A8-4DE0-AAA2-D9BE3E1EAB17.jpeg

    The corner plate that fits over this corner also supports this outer end of the starter jack shaft.
    64A1257E-7682-4AA4-980C-3A88361F1982.jpeg

    With all the primary drive assembled the clutch free play was adjusted & the last jobs were to fit the gear lever followed by the covers on the primary pulley, clutch & that corner plate.
    D28063DE-E1ED-42D7-BC8A-945E91D4EA05.jpeg
     
    • Like Like x 5
  12. Got the electrical connections finished at the front end today & checked as far as possible, i.e. powered up the speedo & checked the idiot lights were all OK. Also, the menu button, (the blue button just below the speedo) works & scrolls through the various display options :upyeah: Fortunately all these connections are hidden inside the headlight shell because they look a bit like a rat's nest !
    I need the Motogadget unit connected now to check the functions of everything like the lights, indicators, etc. This unit will live under the seat along with the battery, ignition switch & magneto kill relay. That will be tomorrow's little task !

    6D71D249-82F8-4B22-88B3-659EF4E6E114.jpeg
     
    • Like Like x 8
  13. Got all the wiring connections finished to the engine today, neutral switch, oil pressure switch, magneto kill connection & starter solenoid & the cables routed into the battery box area. That allowed me to fit the rear cylinder exhaust so that's all done now too. :upyeah:
    Below is the starter-motor solenoid & neutral switch.
    766911CF-43C8-423F-8E97-B5F5B52F9829.jpeg

    Oil pressure switch.
    C2395B06-D298-4317-BFD6-65212550B1EA_1_201_a.jpeg

    And magneto connection.
    CB3A4137-8557-4582-9942-6827EC0BB056_1_201_a.jpeg

    All that's left to do now is make the connections in the battery box to the Motogadget unit, which will live in here, to the right of where the battery mounts !
    C2ED413C-1ACA-4F7C-89FC-E1DF310F9B1D_1_201_a.jpeg
     
    • Like Like x 3
  14. Not exactly my kind of thing but a wonderful job there. :upyeah:
     
    • Thanks Thanks x 1
  15. Not my cup of tea but I am seriously impressed.
     
  16. That is going to win some prizes i believe.
     
    • Agree Agree x 2
Do Not Sell My Personal Information