Separate names with a comma.
Yeah - i dont....i have to get 3 of them out to do anything, plus all the bodywork and plastics are out in the back garden on the patio covered...
Just ordered another one...theres an ebayer in Italy knocking them out for 30 quid a pop plus the carriage...at least i know what it feels like...
While I'm not a fan of the scrambler here's my mates cafe racer which he brought over yesterday for some mods... [ATTACH]
Mostly - what happened...? Oh - welcome to the forum...
Clutch went a bit shit on the way home yesterday on the hyper.... [ATTACH] Had a spare... All good again...
New bearing cups in... That will conclude today's work as I need to take at look at the clutch on the hyper...[ATTACH] Plus there not really much...
Back to it... Engine degrease... [ATTACH][ATTACH]
Pause in working... [ATTACH]
Rear done... [ATTACH]
Prep work commences... Front wheel reassembled... Had some spare ti bolts... Missing one so he'll have to get that one! [ATTACH]
pff - wear something tight for fucks sake..ive gotta say theres some crackers on the motogp grid.
I hope so too. I did say that what we're doing and the way we're doing it can pretty well be applied to any bike....as i say the engine is a...
[MEDIA]
Yeah - itll be a shame to put that filthy dirty engine in our new baby!....although ill be giving it a good dose of Sdoc100 tomorrow...neat.
Over but as suspected but, not by much...having said that as i said were still going to rescue the old engine and do the same as the rest of the...
Unwrapping complete... All that, wheels, frame, swing arm came to 280 all in and the wheels were lacquered also.. Reckon that was great value.....
These footpeg hangers were particularly shocking... Came up really well... [ATTACH]
More stuff to un wrap... [ATTACH]
Bearings and bushes for the wheels and swing arm... Plus other stuff too... [ATTACH]
Quality of masking off was perfect... [ATTACH] [ATTACH] This was rpa coatings in bristol... Warren. Lovely bloke.